Our references

Pumping reference at the level of the operation of one of our customers located in GHARBIA

We have implemented a photovoltaic pumping solution for one of our customers located in the locality of Gharbia, Doukala region. This solution is made up of 134 solar panels, each with a capacity of 505 WCs, thus totaling a power of more than 67 KWp. The installation also includes 3 drives and 3 DC/AC protection panels.

Thanks to this solution, our client was able to achieve several significant improvements. First, he was able to pump water from two wells with a depth of 120 meters. Then he was able to irrigate his land from a large basin. Last but not least, he was able to drastically reduce his energy costs, saving more than 32,000 dhs per month.

The return on investment for this project is estimated at less than 18 months, making it a solution that is both ecological and economically viable.

250 KWp photovoltaic solar power plant

456 panels of 550Wc
3 inverters for a total of 260 Kw
Advanced monitoring and reporting.
Warranty Service and Maintenance:
– Remote monitoring
– Half-yearly visit: preventive maintenance for checking inverters, protection boxes, wiring, tightening, cleaning of panels

AL HARAM, MECCA: PEOPLE COUNT PROJECT AL HARAM, MECCA:
EXPROM GROUPE CDG : SMART building project

The proposed solution is based on Disruptive Technologies sensors and integrates the following components and services:

  • 89 sensors
  • 17 cloud connectors
  • Development of communication interfaces with Exprom systems
  • Installation of sensors and routers at customer sites
  • Temperature and humidity reading
  • Cold room temperature monitoring
  • Door opening detection
  • Counting the number of passages of security guards
  • Optimization of rounds of cleanliness monitoring agents
MARELLI: DATA CENTER SUPERVISION PROJECT
  • closely monitor environmental conditions: temperature, humidity, electric current, door openings, etc.
  • Management of notifications by Mail, SMS,…

ADDRESS

117, corner of Rue de Rome and Bd 2 Mars, 3rd floor, Casablanca, [email protected].